Roof Replacement Options for Davie Homes
Five kinds of re-roof job, each with its own cost range and its own catch.

Tile-for-Tile Re-Roof
Worn concrete tile comes off and new concrete tile goes on. The numbers to expect:
- Installed concrete tile: a typical home lands between $10,500 and $47,500, or $7 to $19 a sq ft (HomeGuide)
- Tear-off of the old tile: up to $150 per square on Fixr's numbers, heavier than stripping shingles
- Time on the roof: most tile jobs take 3 to 5 days
The code does not allow a new roof over old tile, so the tile comes off to the deck. New tile then has to go on a solid sheathed deck. Profiles, attachment methods and the hurricane-zone approvals are covered on the tile roofing page.

Switching From Shingle to Tile or Metal
Changing material changes the load on the framing. One maker's flat concrete tile weighs roughly 970 lb for each 100 sq ft once laid (Eagle's spec sheet). DECRA lists its stone-coated steel tile at 150 to 160 lb for the same area. Going heavier can mean extra cost:
- Structural engineer review: $100 to $220 per hour (HomeGuide)
- Roof reinforcement, if needed: $1,000 to $10,000 (HomeGuide)
- Metal instead: HomeGuide's Florida average for a metal roof is $7,100 to $38,000
If you're weighing a lighter roof, the metal roofing page compares panel types.

Shingle-for-Shingle Re-Roof
This is the cheapest full replacement and the fastest, often done in 1 to 3 days.
- Asphalt shingle roof: typically $5,700 to $12,000 a house, which works out to $3 to $5 a sq ft installed
- Architectural shingles: $400 to $600 per square installed
- Removing the old shingles: $1 to $3 per sq ft, depending on layers
Shingle types and wind ratings are on the shingle roofing page.

Re-Roofing the Flat Sections
Some houses have a low-slope section over an addition or porch, and it can be redone in the same job as the main roof. HomeGuide's ranges:
- Flat roof replacement: about $4,000 to $16,800 per roof ($3 to $11 a sq ft); flat roofing breaks it down by membrane
- TPO membrane: $4 to $10 per sq ft
- Modified bitumen: $4.00 to $7.50 per sq ft
Ask that the flat section and the sloped roof appear as separate lines on the quote. Membrane choices are on the flat roofing page.

Re-Roof With Solar Panels in Place
Panels have to come off before the old roof can. HomeGuide's solar removal guide gives:
- Per panel: $200 to $500, with remove-and-reinstall at the high end
- 20-panel system: $4,000 to $10,000
- Minimum job fee: some solar companies charge $3,000
Disconnecting the system may need a licensed electrician. Get the solar quote first so the panels come off before tear-off day and go back on after the final inspection.

Why Davie homeowners, HOAs and property managers call Davie Roofline
- One request goes to one independent roofer, not a list of five
- Ask for an inspection and a written scope before any deposit
- Ask to see the product approval (NOA) number for every material quoted
- Ask the roofer to name who pulls the Town of Davie permit
- Hold the final payment until Davie's final inspection passes
Davie Re-Roof Permit and Inspection Steps
A full replacement needs a Town of Davie building permit. The Building Division's roofing checklist asks for:
- the permit application and a signed, notarized addendum form
- a Broward County Property Appraiser ownership printout
- the High-Velocity Hurricane Zone roofing package
- a rooftop mounted equipment affidavit
- product approvals (NOAs) "obtained from point of purchase"
- an uplift test at the job site for adhesive-set tile
- the hurricane mitigation retrofit form for single-family homes
Florida Statutes section 553.844 adds that a roof replacement must include a secondary water barrier and stronger roof-deck attachment. The underlayment page and the roof deck page explain both.
The inspection order matters. Davie's checklist requires the tin-cap inspection to be approved before any peel-and-stick goes down. The peel-and-stick inspection comes before tiles are loaded on the roof. The building code then calls for a final inspection by the building official once the work is done. Inspection requests made during a business day are scheduled for the next workday. You can follow your own permit by address on the Town's eSuite portal without an account.
Notice of Commencement. Before the first inspection, a notice of commencement must be recorded with the county and posted at the house. It is void if work doesn't start within 90 days of recording. Jobs with a direct contract price of $2,500 or less are exempt.
Paying for a New Roof: Deposits and Contract Terms
Florida Statutes section 489.126 is the rule to know before you write the first check. A contractor who takes "more than 10 percent of the contract price" as the initial payment must apply for the needed permits within 30 days and start work within 90 days after the permits are issued.
A few habits keep the money side clean:
Don't pay in full up front
HomeGuide advises following a payment plan and getting a receipt for each payment.- Make sure the contract names the roof material, the underlayment and the product approval numbers.
Watch the notice of commencement date
The statutory warning says payments made after it expires "can result in your paying twice."- Check the contractor's license on the state's lookup before signing, as shown on the roof inspection page.
If insurance is paying part of the job, the rules on contractor inducements and cancellation rights after a declared emergency are on the storm damage page.