Community Roof Projects in Davie
Association work splits into five jobs. Each one has its own paperwork, so sort out which one you have before asking for bids.

Low-Rise Condo Buildings
Height decides which Florida condo rules apply. Both the structural integrity reserve study and the milestone inspection apply only to buildings three habitable stories or higher. A one- or two-story condo building escapes both, but the budget still has to carry reserves for roof replacement. Owners of a unit-owner-controlled association can vote, by a majority of all voting interests, to fund less or none.

HOA Color and Profile Approval
Under Florida Statutes section 720.3035, an HOA's architectural review covers what the declaration authorizes, and:
- If published guidelines list material or design options, the association can't restrict an owner's choice among them.
- The association can't make a building permit a precondition for its review.
- A denial must be in writing and name the specific rule and the non-conforming part of the request.
- Every HOA board must adopt hurricane protection specifications, which may include color and style. Hurricane protection includes Florida Building Code roof systems that meet ASCE 7-22. A conforming application can't be denied, though the board may hold owners to a unified building scheme.
Put the approved tile list in writing ahead of the bid request; then all the bids price one product and can be compared line by line.

Phasing a Re-Roof Across Buildings
If the work is phased, phase by whole buildings rather than partial slopes, since Florida's 25% rule limits partial work on one roof section within 12 months (see the roof repair page). For each phase, ask for:
- A per-building price and start window in the same contract
- Where tile pallets and the dumpster will sit, and for how long
- How residents get notice before tile is loaded overhead
The Davie permit and inspection steps are on the roof replacement page; ask whether the roofer will pull one permit per building or per phase.

Reserve and Inspection Timing for Condos
For condo buildings three habitable stories or taller, two statutes set the clock:
- Structural integrity reserve study (F.S. 718.112): at least every 10 years. It lists the roof first and is based on a visual inspection. An engineer, an architect or a certified reserve specialist performs or verifies it, and it states each item's remaining useful life and replacement cost. For budgets adopted on or after December 31, 2024, these associations can't vote to waive reserves for study items.
- Milestone inspection (F.S. 553.899): a structural inspection by an architect or engineer, due by December 31 of the year the building turns 30, then every 10 years. The local agency can move it to 25 years near salt water. The section doesn't mention the roof covering.

Why Davie homeowners, HOAs and property managers call Davie Roofline
- One request goes to one independent roofer, not a list of five
- Ask for an inspection and a written scope before any deposit
- Ask to see the product approval (NOA) number for every material quoted
- Ask the roofer to name who pulls the Town of Davie permit
- Hold the final payment until Davie's final inspection passes
How a Condo Reserve Study Treats the Roof
For condo buildings that need one, the structural integrity reserve study does more than list the roof. Under section 718.112 it has to:
- Identify each item it inspects and state its estimated remaining useful life and replacement cost
- Give a reserve funding plan with a recommended annual amount that reaches that cost by the end of the item's remaining life
- Include at least a baseline funding plan that keeps the reserve cash balance above zero each budget year
The study may recommend no replacement reserve for an item with more than 25 years of estimated remaining life, though it can still set a deferred maintenance amount. That matters for a new roof, so ask the reserve specialist how they rated yours. Once the study is done, a contractor's re-roof bid can be checked against its replacement cost line.
What a Board Should Hand the Roofer Before Bids
A clear bid package gets you comparable prices. Include:
- The declaration's section on who maintains roofs, and the approved tile or shingle list
- A building list with each roof's material, and the year it was last replaced if you have permit records
- The roof line from your latest reserve study, if you have one
- Staging, parking and access rules for crews
- The board contact who signs the contract and approves change orders
Florida's deposit and permit timing rules, which apply to each signed phase, are on the roof replacement page. For plazas and rental apartment buildings, see commercial roofing.