Commercial Roof Systems for Davie Buildings
A commercial bid usually lands on one of these five. HomeGuide rates TPO, built-up and PVC as the best fits for hot climates.

TPO and PVC Single-Ply Membranes
Single-ply roofs are a single layer of membrane. They're the fastest to install, often 2 to 5 days of membrane work depending on size.
- TPO: $4 to $10 per sq ft installed; HomeGuide gives it 10 to 25 years
- PVC: $5 to $12 per sq ft installed; 20 to 30 years, the most durable of the rubber-type membranes in HomeGuide's ranking

Modified Bitumen and Built-Up Roofs
These are layered asphalt systems. Built-up roofing, also called tar and gravel, is built from layers of asphalt and felt. Modified bitumen is also multi-layer but goes on faster.
- Built-up: $3.50 to $7.50 per sq ft, 20 to 30 years, and typically 1 to 2 weeks to install
- Modified bitumen: $4.00 to $7.50 per sq ft, 10 to 20 years, and about 3 to 7 days
Coating Restoration
A fluid-applied coating renews the surface of a sound membrane or metal roof. HomeGuide's installed prices are $1.50 to $4.50 per sq ft for silicone (10 to 15 years) and $0.50 to $3.00 for acrylic (7 to 20 years). In the hurricane zone, coatings fall under the code's testing rules: acrylic coatings, for example, have to be tested to ASTM D6083, and makers need an independent quality-control program. Ask the roofer whether the Town treats your coating job as a permitted roofing project, and get the answer in the contract.

Metal Roofs on Commercial Buildings
Metal is the other option on sloped commercial roofs. HomeGuide's gauge table recommends 24-gauge for residential and commercial roofs in severe-weather climates and 22-gauge for commercial or high-end work. Concealed-fastener (standing seam) runs $900 to $1,600 per square installed, against $500 to $1,200 for exposed-fastener panels. Metal profiles in general are on the metal roofing page.

Repair and Maintenance Programs
SFS, citing the National Roofing Contractors Association (NRCA), says to inspect the roof at least twice a year, ideally in spring and fall, and another after any major storm. In the hurricane zone, repairs have to use product-approved components and can't create additional ponding. The size limit on a repair before the whole section has to be redone is the 25% rule; our roof repair page walks through it.

Why Davie homeowners, HOAs and property managers call Davie Roofline
- One request goes to one independent roofer, not a list of five
- Ask for an inspection and a written scope before any deposit
- Ask to see the product approval (NOA) number for every material quoted
- Ask the roofer to name who pulls the Town of Davie permit
- Hold the final payment until Davie's final inspection passes
Recover or Tear-Off? Broward's Hurricane-Zone Rules
Laying a new system over the old one saves tear-off, but the Florida Building Code's hurricane-zone section sets conditions:
One recover only
one additional roof system may go over the original assemblyDry enough
a TAS 126 moisture survey has to come back at or under 5% by weight for the membrane and 8% for any board insulationBonded recovers
the old membrane has to pass a TAS 124 uplift testSound deck
no new system over sheathing that's water-soaked, deteriorated or not fastened to code; bad areas come outSteel decks
checked for corrosion, and decks lighter than 22 gauge are field-tested for fastener pull-outPonding
if water could pond, the contractor must say so in writing and advise the owner to get a structural reviewDrains
a re-roof can't reduce the number or size of existing drains or scuppers without a new engineered drainage design
Paperwork a Davie Property Manager Should Expect
Permit package
Davie's roofing checklist asks for a Rooftop Mounted Equipment Affidavit and a certificate of insurance naming the Town of Davie as certificate holderOwner's notification
the hurricane-zone uniform permit application includes the Owner's Notification for Roofing Considerations, filed as two signed copiesLicense
Florida defines a roofing contractor's work as unlimited in the roofing trade; check the license number on the state's site as shown on the roof inspection pageSchedule
Davie inspection requests made during a business day go on the next workday's schedule, so build those days into tenant notices
Our roof replacement page has the Town permit sequence in general terms.
