Roof replacement and repair referrals · Davie, FL

Commercial Roofing in Davie, FL

  • Commercial flat roof: HomeGuide puts installed cost at $4 to $11 per sq ft
  • Membranes: TPO $4 to $10 and PVC $5 to $12 per sq ft installed
  • Time on the roof: Delta Services, a commercial roofing company, estimates 1 to 4 weeks for a full install and often 2 to 5 days for single-ply membrane
  • Recover limit: in Broward's hurricane zone, the code allows only one new roof system over the original one

Davie Roofline routes property-manager requests to a commercial roofing contractor for plazas, office buildings, warehouses and apartment roofs. Treat the per-foot figures as national guide ranges for checking a bid, since a building's deck, drains and rooftop units set its real price. Condo and HOA buildings have reserve and inspection rules of their own, covered on the HOA roofing page.

Get a free roofing estimate

Free for homeowners, HOAs and property managers. One local contractor contacts you.

Commercial Roof Systems for Davie Buildings

A commercial bid usually lands on one of these five. HomeGuide rates TPO, built-up and PVC as the best fits for hot climates.

Wide flat white single-ply membrane roof on a one-story retail building with rooftop AC units and a parapet

TPO and PVC Single-Ply Membranes

Single-ply roofs are a single layer of membrane. They're the fastest to install, often 2 to 5 days of membrane work depending on size.

  • TPO: $4 to $10 per sq ft installed; HomeGuide gives it 10 to 25 years
  • PVC: $5 to $12 per sq ft installed; 20 to 30 years, the most durable of the rubber-type membranes in HomeGuide's ranking
Crew seen from a distance rolling out a dark modified bitumen cap sheet on a low-slope office roof

Modified Bitumen and Built-Up Roofs

These are layered asphalt systems. Built-up roofing, also called tar and gravel, is built from layers of asphalt and felt. Modified bitumen is also multi-layer but goes on faster.

  • Built-up: $3.50 to $7.50 per sq ft, 20 to 30 years, and typically 1 to 2 weeks to install
  • Modified bitumen: $4.00 to $7.50 per sq ft, 10 to 20 years, and about 3 to 7 days
Roller-applied white silicone coating spreading across an older gray membrane roof on a warehouse

Coating Restoration

A fluid-applied coating renews the surface of a sound membrane or metal roof. HomeGuide's installed prices are $1.50 to $4.50 per sq ft for silicone (10 to 15 years) and $0.50 to $3.00 for acrylic (7 to 20 years). In the hurricane zone, coatings fall under the code's testing rules: acrylic coatings, for example, have to be tested to ASTM D6083, and makers need an independent quality-control program. Ask the roofer whether the Town treats your coating job as a permitted roofing project, and get the answer in the contract.

Pitched standing seam metal roof on a small one-story commercial building with a palm-lined parking lot

Metal Roofs on Commercial Buildings

Metal is the other option on sloped commercial roofs. HomeGuide's gauge table recommends 24-gauge for residential and commercial roofs in severe-weather climates and 22-gauge for commercial or high-end work. Concealed-fastener (standing seam) runs $900 to $1,600 per square installed, against $500 to $1,200 for exposed-fastener panels. Metal profiles in general are on the metal roofing page.

Inspector seen from behind photographing a pitch pan and AC curb flashing on a flat commercial roof

Repair and Maintenance Programs

SFS, citing the National Roofing Contractors Association (NRCA), says to inspect the roof at least twice a year, ideally in spring and fall, and another after any major storm. In the hurricane zone, repairs have to use product-approved components and can't create additional ponding. The size limit on a repair before the whole section has to be redone is the 25% rule; our roof repair page walks through it.

Gloved hands lifting a terracotta barrel tile beside a metal valley flashing on a tile roof

Why Davie homeowners, HOAs and property managers call Davie Roofline

  • One request goes to one independent roofer, not a list of five
  • Ask for an inspection and a written scope before any deposit
  • Ask to see the product approval (NOA) number for every material quoted
  • Ask the roofer to name who pulls the Town of Davie permit
  • Hold the final payment until Davie's final inspection passes

Get a free roofing estimate

Free for homeowners, HOAs and property managers. One local contractor contacts you.

Recover or Tear-Off? Broward's Hurricane-Zone Rules

Laying a new system over the old one saves tear-off, but the Florida Building Code's hurricane-zone section sets conditions:

  • One recover only

    one additional roof system may go over the original assembly
  • Dry enough

    a TAS 126 moisture survey has to come back at or under 5% by weight for the membrane and 8% for any board insulation
  • Bonded recovers

    the old membrane has to pass a TAS 124 uplift test
  • Sound deck

    no new system over sheathing that's water-soaked, deteriorated or not fastened to code; bad areas come out
  • Steel decks

    checked for corrosion, and decks lighter than 22 gauge are field-tested for fastener pull-out
  • Ponding

    if water could pond, the contractor must say so in writing and advise the owner to get a structural review
  • Drains

    a re-roof can't reduce the number or size of existing drains or scuppers without a new engineered drainage design

Paperwork a Davie Property Manager Should Expect

  • Permit package

    Davie's roofing checklist asks for a Rooftop Mounted Equipment Affidavit and a certificate of insurance naming the Town of Davie as certificate holder
  • Owner's notification

    the hurricane-zone uniform permit application includes the Owner's Notification for Roofing Considerations, filed as two signed copies
  • License

    Florida defines a roofing contractor's work as unlimited in the roofing trade; check the license number on the state's site as shown on the roof inspection page
  • Schedule

    Davie inspection requests made during a business day go on the next workday's schedule, so build those days into tenant notices

Our roof replacement page has the Town permit sequence in general terms.

Frequently asked questions

Our plaza roof leaks at two drains. Do we have to replace the whole thing?

Not by default. Repairs can be made with product-approved materials, but in the hurricane zone they can't create new ponding, and drains or scuppers can't be reduced in number or size. Whether the 25% repair limit applies depends on the code the roof was last built under. Ask for a written scope that marks the wet areas on a roof plan before you decide.

Can a new membrane go right over our old built-up roof?

Once. Broward's hurricane-zone code allows one additional roof system over the original, and only after testing. Membrane moisture can't exceed 5% by weight and board insulation 8%, measured by a TAS 126 survey. A bonded recover also needs a TAS 124 uplift test of the old membrane, filed with the permit application.

How often should a commercial roof be looked at?

Twice a year plus after major storms, the NRCA guideline that SFS cites (see maintenance, below). In Davie that can mean one visit before hurricane season starts on June 1 and one after it ends on November 30, and the photos from each give you a dated record of the roof.

Is a roof coating a real fix or just paint?

It can extend a sound roof, but it doesn't replace one. HomeGuide puts silicone at $1.50 to $4.50 per sq ft installed with a 10 to 15 year life, and notes it resists ponding water. Acrylic runs $0.50 to $3.00 and 7 to 20 years. Ask the roofer to show you the membrane and seam condition before you accept a coating quote.